We’re now offering aluminum door panels for the 1992-1996 Prelude!
-Engineered and manufactured in house in the USA
-CNC laser cut from 0.063″ (1.5mm) aluminum, finished with an even brushed finish
-Sold as a pair
-Ready to be painted, powder coated, wrapped, or can be left raw to match your interior/build
-Approximately 5″ of interior space is gained by the panels sitting flat against the door (great for roll cages, racing seats, etc)
-Uses all factory mounting locations in the door so there is no drilling, cutting, or modifying your doors*
-Mounting hardware, pull straps, and detailed installation instructions are included
-Re-uses stock rubber window trim so the glass doesn’t rattle or drag against the panels (Some disassembly of your existing panels is required to attach the factory inner window seal to our panels)
If you have any questions please contact us! 🙂
Notes:
-Textured matte black powder coat samples can be seen in the pictures. They are for reference only and coating might vary slightly with different batches.
-Powder Coating will add approximately 3 weeks to our standard build time.
-Switches – Power Window Switches are always included regardless of your selection. If you do not want provisions for the power window switches please leave a note during checkout (underneath where you enter your billing/shipping information) asking us to omit them.
-1 mounting hole per door needs an M5 rivet nut (rivnut) installed. There is an existing hole, so no real modification is needed, it just needs to be installed. While this doesn’t permanently alter the door, they would need to be drilled out to be removed and returned to stock panels.
-Installation requires the use of a rivnut tool which is not provided.
-*If you choose the “No Door Handle Bracket Notch” option you will need to cut a piece off of your inside door handle bracket so that the door panel can sit down low enough without interference. This is shown in the pictures and is documented in the installation instructions.
*All products are made to order in house by Landon and Rebecca, so we currently have a 15 business day (3 week) build time. Thanks for understanding!*